Skip to content

References

Mandates from practice.

We run mandates confidentially. The cases below are anonymised and show how we work and what stays in the business. We name further references in conversation — under a confidentiality agreement if you prefer.

Automotive supplier · Drivetrain components

An OEE programme at an automotive supplier

Starting point
A plant for drivetrain components was struggling with unplanned downtime and unstable processes.
Role & responsibility
Analysis of the production workflows, prioritisation of the critical bottlenecks and support through implementation in the plant.
Measures
  • Thorough analysis of the production workflows using lean methods
  • Bottleneck analysis with the Siemens Digital Twin
  • Process optimisation at the critical bottlenecks
  • Predictive-maintenance concept developed
What was delivered
Handed over: a prioritised bottleneck list, a predictive-maintenance concept and one shared set of figures for production and maintenance.

Automotive · E-mobility

An end-to-end digital thread for an electric-vehicle manufacturer

Starting point
Design changes could not be traced without gaps from the first draft through to the plant.
Role & responsibility
Design and implementation of an integrated PLM architecture.
Measures
  • PLM architecture based on CONTACT Software
  • Engineering data, bills of materials, variant management and production data joined in one digital thread
  • Change management made traceable across the whole chain
What was delivered
Handed over: an integrated PLM architecture and one continuous structure for engineering data, bills of materials, variant and production data.

A similar starting point?

Tell us about the situation, the sector and the timeframe. We respond within one working day.